
Connect electricity + gas before move-in day. Skip the default plan. It’s the comparison price set by the Australian Energy Regulator, and may not be the cheapest. Compare a range of retailers via our Compare the Market partnership.
Free comparison via our trusted partner.
Most retailers need 1 to 3 business days metro / 5 to 10 rural. New builds need 10 to 20 business days for a fresh meter install. Don’t move in on day one with the power off.
The Default Market Offer is the comparison price set by the Australian Energy Regulator, and the maximum price for a standing offer plan, often not the cheapest. Most retailers offer market plans below it. Always ask for the cheapest market plan. Don’t accept the first plan offered.
For electricity, you can switch retailers any time outside WA, regional QLD and NT. No fee, no supply interruption (WA’s Perth gas market is deregulated, so gas can be switched there). Standard switch takes 2 to 3 business days. Compare and switch when you move in.

Compare electricity and gas plans before move-in day, and pay what you should, not the lazy tariff.
We believe the best decisions start with a comparison. That's why our team has spent over a decade helping millions of Aussies compare prices and search for a better deal.
We strive to empower our customers to make better choices, saving them time, money and stress.
4.4/5 on Product Review (3,348 reviews) · 4.7/5 on Feefo (2,836 reviews) · 23 million comparisons, across all Compare the Market comparison services. Ratings as of 15/07/2026.
Why we picked Compare the Market
By providing your energy bill, you can receive real cost estimates based on your actual usage, not just headline rates.
NestPath earns a commission if you take out an energy plan through Compare the Market. No extra cost to you, and it doesn't change the comparison results you see. Affiliate revenue keeps NestPath free for first home buyers.
Compare The Market does not compare all plans in the market. See their website to view their range of brands.
One click, opens in a new tab. A couple of minutes to share your address and usage details.
See real prices side by side from multiple Australian retailers. Compare the Market handles the comparing, no human chasing.
Pick a plan, lock it in, switch happens before you arrive. You walk in, flip a switch, it works.
| State | Retailer Choice | Connection Notice | Compare the Market* |
|---|---|---|---|
| NSW | Yes, multiple retailer competition | 1 to 3 business days metro; next-day before 2pm | Covered |
| VIC | Yes, multiple retailer competition | 1 to 3 business days | Covered |
| QLD | SE QLD: yes, multiple retailer competition. Regional/Far North: Ergon monopoly | 1 to 3 business days | SE QLD only |
| WA | Electricity: no choice. Gas: multiple retailers in Perth | 3 to 5 business days metro; 6 to 10 rural | Gas only (Perth) |
| SA | Yes, multiple retailers | 1 to 3 business days | Covered |
| TAS | Aurora Energy is the local-area retailer | 1 to 3 business days | Not covered |
| ACT | Yes, multiple retailers | Same-day available before 1pm online | Covered |
| NT | Limited, depends on location and usage | Varies | Not covered |
Connection timing depends on your retailer, distribution network, and whether the property is metro or regional. Timeframes assume the meter is in place. New builds may take 10 to 20 business days for meter installation. Apartments in embedded networks may not have retailer choice; check with your body corporate.
*Compare The Market does not compare all plans in the market. See our website to view our range of brands.
Start connecting utilities 2 to 4 weeks before settlement. You can sign up online or over the phone. Have your settlement date, the new address, and a form of ID ready. Most retailers will activate the service on the date you specify, so there is no risk of being charged before you move in.
Typical connection timeframes (aim for the longer end to be safe):
Lock in your utility connection dates as soon as your settlement date is confirmed, so the power and gas are on the day you move in.
The core utilities every new homeowner needs to sort before moving day are electricity, gas (if applicable), and water. Everything else is optional.
Where you live determines which official comparison tool applies:
Our Compare the Market partnership also covers these verticals. Explore them all in the Insurance Hub.
These links open our Insurance Hub guides. NestPath earns a commission if you take out a policy or plan through Compare the Market from those guides, at no extra cost to you. Same disclosure as the main partnership block above.
Connect electricity 2 to 4 weeks before settlement. You can compare a range of plans first using a comparison site like Compare the Market, then sign up. Have your settlement date, the new address, and a form of ID ready. Connection usually takes same day to 3 business days if a meter is already installed. For new builds with no active meter, allow 5 to 10 business days plus an electrician visit to install the meter. Choose a connection date the day before you move in, in case there is a delay.
Set up at least 5 business days before move-in. Most retailers connect electricity within 1 to 3 business days and gas within 3 to 5 business days; rural/regional addresses can take longer. Same-day is sometimes available for an extra fee. You’ll need move-in date, NMI (electricity) or MIRN (gas) if you have them, and proof of ID.
Yes. Many retailers offer same-day or next-business-day if a meter is installed and you book before a cut-off (typically 12pm to 2pm). An urgent-connection fee may apply; the amount varies widely by retailer, meter type, and whether it is booked in or out of business hours. ACT (ActewAGL) is particularly fast: same-day before 1pm. WA, NT, and rural addresses generally cannot do same-day. If you’ve moved in and the power is off, call your retailer first, not the distributor.
It varies widely by household size, state, and usage. As a rough guide, many households fall somewhere between roughly $1,200 and $2,500 a year, with larger homes (pool, ducted aircon, electric hot water) higher and small apartments lower. Because costs differ so much by location and usage, the most reliable way to estimate yours is to compare plans using your own usage figures. Comparing at move-in, rather than defaulting to the standing offer, is one of the higher-value utility decisions a first home buyer can make.
If the home has solar, get your usage (import) rates competitive first (that is what matters most), then treat the solar feed-in tariff (FiT) as a valuable added extra. The FiT is what your retailer pays you for excess solar exported to the grid, typically 4 to 12c/kWh in 2026. When you compare, share as much usage detail as you can so the estimate reflects your real costs, and ask the seller for their last 4 quarterly bills to gauge usage and export.
Not always. Bundling can simplify billing and sometimes unlock a small dual-fuel discount, but the cheapest electricity plan in your area often isn’t with the same retailer as the cheapest gas plan, and bundling can work out more expensive overall. Compare both bundled and separate options before deciding.
In most Australian states, water stays connected and simply transfers at settlement. Your conveyancer handles the final meter reading and account transfer. No separate connection or phone call needed in most cases. Confirm with your council or water authority if you’re unsure, and check your first water bill after settlement.
Most retailers ask for 1 to 3 business days’ notice for next-day connection in metro areas. For new builds with no meter installed, allow 10 to 20 business days. Safe default: organise utilities 5 to 7 business days before move-in so the meter read aligns with your move-in date.
Usually no. NSW and QLD distributors sometimes require an adult onsite if the power is currently off at the meter. Most other states proceed without anyone present, provided the meter is accessible and the main switch is off. Whoever you sign up with will confirm the requirements when you book.
WA and NT residential customers don’t have a choice of electricity retailer. In WA’s South West Interconnected System (Perth metro through to the southwest), Synergy is the government-owned electricity retailer; Horizon Power covers regional WA. WA’s gas market, however, is deregulated, so Perth households can choose from several gas retailers. In the NT, electricity is regulated by the NT Government and is not part of the National Energy Market, with availability depending on your location.
Every retailer has a default plan for new customers who don’t actively select one. For electricity, the Default Market Offer (DMO) is the comparison price set by the AER on default contracts in NSW, SA, and SE QLD; in VIC, the Victorian Default Offer (VDO) does the same. Default plans are the maximum price for a standing offer plan and are often not the cheapest. Most retailers offer market plans below the default, so always ask for their cheapest market plan.
When you connect, ask the retailer specifically for their cheapest market plan that fits your usage. In Victoria, retailers must display a best-offer message on your bill if you could save on another of their plans. Always actively select a plan. Don’t accept the first plan offered without asking what else is available.
Yes. For electricity in NECF states (NSW/SE QLD/SA/ACT/TAS) and VIC, there’s no fee to switch, the new retailer handles the transfer, and supply isn’t interrupted (usually 2 to 3 business days). WA, regional QLD and NT don’t have electricity retailer choice, but WA’s Perth gas market is deregulated, so gas customers there can switch retailers.
New builds usually need a meter installed before connection. Most distributors quote about 5 business days metro / up to 10 business days rural for a new meter. Your builder commonly submits the meter registration to the distributor, so check with them first. Submit your connection request as soon as your builder confirms practical completion.
NMI = National Meter Identifier, a unique 10- or 11-character identifier for your property’s electricity meter (e.g. NMIVIC0001 23456). Easiest way for a retailer to set up your connection because it skips an address lookup. Find it on any previous electricity bill (ask the seller or your conveyancer), on the meter itself (printed on a small sticker), or by calling your distributor. Compare the Market’s comparison tool also lets you enter your NMI directly instead of the address. For gas, the equivalent is MIRN (Meter Installation Reference Number).
Compare the Market’s energy comparison covers NSW, VIC, SE QLD, SA, and ACT, comparing a range of major Australian electricity and gas retailers. It doesn’t cover Tasmania, or electricity in WA, NT, and regional QLD, where monopoly retailers apply. In WA, the Perth gas market is deregulated, so gas plans can be compared there. Compare The Market does not compare all plans in the market. See their website to view their range of brands.
Drop us a quick note and we’ll come back within 24 hours with a straight answer, and a heads-up if Compare the Market or a different option is the right next step for your state.
Everything you need to buy your first home
Important information
This page provides general information only and does not constitute personal energy or financial advice. NestPath partners with Compare the Market via affiliate referral. We earn a commission if you take out an energy plan through them, at no extra cost to you. Always read the energy plan’s Energy Price Fact Sheet (EPFS) and key contract terms before signing. Connection timing depends on your retailer, distribution network, and metro/regional location. Figures quoted are typical not guaranteed.